- Name of The Project:
e-Manager (Ongoing Project).
Development Tools: Visual Basic 6 as Front-end Tool and MDB (Microsoft
Database) as Backend Database and Crystal Report 7.0 for Report Generation.
Brief Description: The package deals with the process at the
office and factory of Nutrithera Laboratory pertaining to maintenance
of inventory, invoicing, Accounts & Payroll etc. The Client (NTL)
is an organisation engaged in manufacturing of medicines. It takes order
from drug manufacturer/supplier on contract basis, does the manufacturing
and supplies back t the manufacturer. The software controls and monitors
the whole process (in the factory) along with the tracking of ransaction
information (at the office
Responsible For: Designing the Project and coding of Factory
Module.
|
- Name of The Project:
Atithi (Ongoing Project).
Development Tools: Visual Basic 6 as Front-end Tool and Oracle
8i as Backend Database and Crystal Report 7.0 for Report Generation.
Brief Description: The package is related to control the overall
flow of the International Guest House maintained by The Ramakrishna
Mission Institute of Culture, Golpark, Kolkata.
Responsible For: Project-in-charge of a 3 member team. From designing
to implementation - in every level the applicant is responsible for
(until the leaving of the organisation).
|
- Name of The Project:
Krishi Payroll 1.0.
Development Tools: Visual Basic 6 as Front-end Tool and MDB (Microsoft
Database) in Back-end and Crystal Report 7.0 for Report Generation.
Brief Description: Payroll related package.
Responsible For: Project-in-charge. From designing to implementation
- in every level the applicant is responsible for.
|
- Name of The Project:
Krishi Receipt.
Development Tools: Visual Basic 6 as Front-end Tool and MDB (Microsoft
Database) in Back-end and Crystal Report 7 for Report Generation.
Brief Description: Receipt generation package with internal tracking
of outstanding and payment history.
Responsible For: Project-in-charge. From designing to implementation
- in every level the applicant is responsible for.
|
- Name of The Project:
OCT Invoice.
Development Tools: Visual Basic 6 as Front-end Tool and MDB (Microsoft
Database) in Back-end and Crystal Report 7 for Report Generation.
Brief Description: Very small software for internal office use
of our mother company.
Responsible For: Complete project.
|
- Name of The Project:
Digital Neuro
Development Tools: Visual Basic 6 as Front-end Tool and Oracle
8 as Back-end. For Report generation Crystal Report 7.0 and DOS-Reports
(For faster printing in Billing module).
Brief Description: Health-care software with hospital management
and administration scheme. In this package In-patient Record Maintenance,
Billing, Cash Flow Control, Accounts, Payroll etc. are managed properly.
Responsible For: Project-guide. Only system study and designing
of the operational flow.
|
- Name of The Project:
Cargo
Development Tools: Visual Basic 6 as Front-end Tool and MDB (Microsoft
Database) in Back-end.
Brief Description: The package is related to shipping and international
surface transport. Cargo booking and its different queries are the main
beauty of this software. This software can track the vessel information
in the international shipping lines (routes) and provide the up-to-date
vessel information. Technical details as usual.
Responsible For: Project-in-charge. From designing to implementation
- in every level the applicant is responsible for.
|
- Name of The Project:
AMC Mess Bill.
Development Tools: Visual Basic 6 as Front-end Tool and MDB (Microsoft
Database) in Back-end and Crystal Report 4.6 for Report Generation.
Brief Description: The package is related to mess bill calculation
and billing of officers' club of the Eastern Commands, AMC Command Hospital,
Kolkata.
Responsible For: Project-in-charge. From designing to implementation
- in every level the applicant is responsible for.
|
- Name of The Project:
AutoAct.
Operating System: Windows 95/98 and Windows NT.
Development Tools: Visual Basic 6 as Front-end Tool and MDB (Microsoft
Database) in Back-end.
Brief Description: The package handles the total sales, support
and management of a group of automobile dealers and their multi-location
showrooms .The Front-end and Backend connectivity is done with the help
of DAO. The offline connection between two dealers or showrooms is maintained
through e-mail (calling Outlook Express from the program itself) and
in other version it is done by the online connection with the help of
MS Comm Control.
Responsible For: Form Designing and (Crystal) report designing.
To speed up the process some DOS printing module has been developed.
|
- Name of The Project:
Remedy 2000.
Operating System: Windows 95/98 and Windows NT.
Development Tools: Visual Basic 5 as Front-end Tool and MDB (Microsoft
Database) in Backend (in standard version) and MS SQL Server in Backend
(in premier version).
Brief Description: It is a time-tested software, which is running
at five medical diagnostic centers. Previously it was a DOS-based system,
now converted to Windows-based system. It was the sole responsibility
of the applicant to develop and customize it upto the implementation
level. The package handles the total management of a diagnostic centre
including different MIS and Medical Report Preparation. In case of the
standard version, the Front-end and Backend connectivity is done through
DAO. In case of the premier version it is RDO.
|
- Title: EPA - ELECTROPHORESIS
Analysis Program.
Development Tools: VISUAL BASIC 4.0.
Environment: Windows.
Brief Description: The software discriminates rice cultivers
by comparing protein bands of the cultivers obtained through SDS-PAGE
and draws a zymogram.
|
- Title: LIBTRAN, Library
day-to-day Transaction System.
Development Tools: FoxPro 2.6
Environment: DOS 6.22
Role: System study, designing and programming.
Brief Description: The System is divided into several module
e.g. Book transaction module, record maintenance, label generation,
library fine calculation, new book entry, introduction of new member
etc. Initially it was developed as a project work of DCA. Later, some
modification was done according to the need of the client.
|